Summary for Test 2026-03-14-4-10
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 1000607 DEA: 081K6904 EFIS: 0819000090 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-74-5.7/11.8 |
| Award Date | 01/09/2025 |
| Closeout Date | Not set |
| Work Description | ROCK EXCAVATION, HMA (TYPE A), RHMA-G, AND CABLE NET DRAPERY SYSTEM. |
| Location Description | RIVERSIDE COUNTY IN AND NEAR LAKE ELSINORE FROM MONTE VISTA STREET TO GRAND AVENUE |
| QA Service Level | 1 (Verified on 01/13/2025) |
Sample Information
| Sample Taken Date | 03/14/2026 | Sample Unique Key | 4 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 03/17/2026 | Sample type | Verification |
| A brief description of the sample | Asphalt Binder Sample | The quantity of what the sample constitutes | 1can |
| From where was the sample collected | Source | First name of sampler or witnessed by | Dylan |
| Last name of sampler or witnessed by | Nault | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Martin Mariett(CCA) Lake Elsinore | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-16 |
|---|---|---|---|
| Modified | Lot number | ||
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | Valero Marketing & Supply - Wilmington - Wilmington CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | ||
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2026-03-14-4
DIME Test ID: 2026-03-14-4-10
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2026-05-28
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: No
Input Type: Measured
Tester's full name: Sunday Agude
Date of test: 03/20/2026
Any material loss from containers during heating process/testing?: no data
Mass of container #1 before test (m1i): 202.479 grams
Mass of container #2 before test (m2i): 206.227 grams
Mass of container #1 after test (m1f): 202.398 grams
Mass of container #2 after test (m2f): 206.145 grams
Mass of empty container #1: 167.459 grams
Mass of empty container #2: 170.913 grams
Average mass change: -0.232 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/28/2026 ✔
