Summary for Test 2026-04-24-84-1
Test performed: CTM 557-June 2020Project Information
| Project Identifiers | Project ID: 1001391 DEA: 051S4904 EFIS: 0525000044 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-1-10.14 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Excavating and Grading, repair/stabilize embankment, Soldier Pile Wall construction, Paving, Providing temporary traffic control |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 07/15/2025) |
Sample Information
| Sample Taken Date | 04/24/2026 | Sample Unique Key | 84 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/25/2026 | Sample type | Quality Control |
| A brief description of the sample | 4x8 Cylinders | The quantity of what the sample constitutes | 7 |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Al |
| Last name of sampler or witnessed by | Pineda | Title of sampler | Field Technician |
| Telephone number of sampler | Laboratory sample identification | 590GN3010 Set 1 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | CalPortland | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | Pileasters 10-18 | |
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 590GN3010 |
|---|---|---|---|
| The truck number from where the sample was collected | Load 1 | The batch plant ticket number from where the sample was collected | 0 |
| Concrete batch plant | CalPortland | The fabricator/manufacturer designation for the sample | Set 1 |
| A detailed description of where the material sample was collected | Pileasters 10-18 | Where the material sample would have been placed if not sampled | |
| From Lot No. | 1 | Bag Lot No. | 1 |
Test Details
DIME Sample ID: 2026-04-24-84
DIME Test ID: 2026-04-24-84-1
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2026-09-23
Test Results
Input Type: Calculated
Tester's full name: Al Pineda
Date of test: 04/24/2026
Temperature: 73 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/23/2026 ✔