Summary for Test 2026-04-28-9-6
Test performed: FFS 1-23Project Information
| Project Identifiers | Project ID: 1001571 DEA: 051Q1604 EFIS: 0522000177 |
|---|---|
| DIST-CO-RTE-PM | 05-MON-1-60.0 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | ELECTROCHEMICAL CHLORIDE EXTRACTION (ECE) OF BRIDGE STRUCTURE. |
| Location Description | MONTEREY COUNTY NEAR BIG SUR AT ROCKY CREEK BRIDGE |
| QA Service Level | 1 (Verified on 09/08/2025) |
Sample Information
| Sample Taken Date | 04/28/2026 | Sample Unique Key | 9 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/28/2026 | Sample type | Quality Assurance |
| A brief description of the sample | Spall Repair Filler | The quantity of what the sample constitutes | Spall Repair Trial |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Joseph |
| Last name of sampler or witnessed by | Esteybar | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | ACC West Coast | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Rapid Set | Manufacturer | CTS |
|---|---|---|---|
| Mix no. | 18 | Materials Received | na |
| Lot no. | na | Batch Number | na |
Test Details
DIME Sample ID: 2026-04-28-9
DIME Test ID: 2026-04-28-9-6
Testing Lab: CT D05 - Monterey Construction Field Laboratory
Test Method: FFS 1-23: Field Investigation Report (FIR)
Test Release Date: 2026-05-27
Test Results
Input Type: Calculated
Tester's full name: Joseph Esteybar
Date of test: 04/28/2026
Requesting office: Monterey Construction
Requesting district: 5
Date of requested service: no data
Tests requested: CTM 521
Job description and purpose: ECE and spall repair
Lane closure needed or not?: Yes
Night shift needed or not?: No
Special equipment required: no data
Are there any other Caltrans offices or consultants involved in the job?: no data
Job date: no data
Number of employees involved: no data
Are field samples submitted to a laboratory for additional tests?: no data
General comments (publicly viewable) (Max 1000 characters): 1 set of 3 4x8 cylinders to be broken at 6 hour mark.
Test was verified on 5/27/2026 ✔
