Summary for Test 2026-05-16-6-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 1000607 DEA: 081K6904 EFIS: 0819000090 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-74-5.7/11.8 |
| Award Date | 01/09/2025 |
| Closeout Date | Not set |
| Work Description | ROCK EXCAVATION, HMA (TYPE A), RHMA-G, AND CABLE NET DRAPERY SYSTEM. |
| Location Description | RIVERSIDE COUNTY IN AND NEAR LAKE ELSINORE FROM MONTE VISTA STREET TO GRAND AVENUE |
| QA Service Level | 1 (Verified on 01/13/2025) |
Sample Information
| Sample Taken Date | 05/16/2026 | Sample Unique Key | 6 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/16/2026 |
| Sample type | Acceptance | A brief description of the sample | Subgrade |
| The quantity of what the sample constitutes | 26.8 kg | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Francisco | Last name of sampler or witnessed by | Ruvalcaba |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CTM 231 Test Locations | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | SR-74 EB, Mainline Roadway 2.2' Below FG, Sta 746+50 - 750+50 | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2026-05-16-6
DIME Test ID: 2026-05-16-6-1
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2026-05-22
Test Results
Method Type:: Standard Count
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Francisco Revalcaba
Date of test: 05/16/2026
Gage No.: 33197
Test No.: no data
Nuclear By: Francisco Ruvalcaba
Non-Bias Plan No.: 4
Depth: 8"
Material No.: no data
Material Type: Native Subgrade
Impact By: Francisco Ruvalcaba
Standard Count Density: 1734 g/cc
Count or Density 1: 829 g/cc
Count or Density 2: 743 g/cc
Count or Density 3: 794 g/cc
Count or Density 4: 861 g/cc
Count or Density 5: 1010 g/cc
Standard Count Moisture: 577 g/cc
Moisture Count 1: 106 g/cc
Moisture Count 2: 87 g/cc
Moisture Count 3: 84 g/cc
Moisture Count 4: 94 g/cc
Moisture Count 5: 88 g/cc
Sum of Count or Density: 4237 g/cc
Average of Count or Density: 847 g/cc
Sum of Moisture Count: 459 g/cc
Average of Moisture Count: 92 g/cc
Count Ratio Density: 0.49
Count Ratio Moisture: 0.16
Calculated Percent Relative Compaction: 96.4 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/22/2026 ✔
