Summary for Test 2026-05-13-17-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 214697 DEA: 07307104 EFIS: 0714000213 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-101-32.8 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | CONSTRUCT BRIDGE. |
| Location Description | LOS ANGELES COUNTY IN AND NEAR AGOURA HILLS FROM 0.1 MILE WEST OF LIBERTY CANYON ROAD UNDERCROSSING TO 0.6 MILE EAST OF PALO COMADO OVERCROSSING |
| QA Service Level | 1 (Verified on 07/12/2021) |
Sample Information
| Sample Taken Date | 05/13/2026 | Sample Unique Key | 17 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/13/2026 |
| Sample type | Acceptance | A brief description of the sample | Structural Backfill |
| The quantity of what the sample constitutes | 400 SF | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Michelangelo | Last name of sampler or witnessed by | Sese |
| Title of sampler | Telephone number of sampler | 310-345-6204 | |
| Laboratory sample identification | 26-1698 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | NA | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Jobsite | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2026-05-13-17
DIME Test ID: 2026-05-13-17-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2026-05-13
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Michelangelo Sese
Date of test: 05/13/2026
Gage No.: 60203
Test No.: no data
Nuclear By: Michelangelo Sese
Non-Bias Plan No.: 2
Depth: 7
Material No.: no data
Material Type: Structural Backfill
Impact By: Michelangelo Sese
Standard Count Density: 2172 g/cc
Count or Density 1: 2.1 g/cc
Count or Density 2: 2.09 g/cc
Count or Density 3: 2.14 g/cc
Standard Count Moisture: 643 g/cc
Moisture Count 1: 0.16 g/cc
Moisture Count 2: 0.14 g/cc
Moisture Count 3: 0.17 g/cc
Sum of Count or Density: 6.33 g/cc
Average of Count or Density: 2.11 g/cc
Sum of Moisture Count: 0.47 g/cc
Average of Moisture Count: 0.16 g/cc
Calculated Percent Relative Compaction: 96.3 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters): Rte. 101 - Wildlife Crossing Project
West-Side of Abutment #2 along Agoura Rd
Test was verified on 5/13/2026 ✔
