Summary for Test 2026-05-12-31-1
Test performed: CTM 216-June 2011Project Information
| Project Identifiers | Project ID: 1000781 DEA: 040P9304 EFIS: 0418000027 |
|---|---|
| DIST-CO-RTE-PM | 04-CC-80-7.6,12.8 |
| Award Date | 03/19/2025 |
| Closeout Date | Not set |
| Work Description | BRIDGE RAILING, MVP, CURB & GUTTER, SIDEWALKS, & ELECTRICAL SYSTEMS. |
| Location Description | CONTRA COSTA COUNTY IN PINOLE AT APPIAN WAY OVERCROSSING AND NEAR HERCULES AT CUMMINGS SKYWAY OVERCROSSING. |
| QA Service Level | 1 (Verified on 12/27/2024) |
Sample Information
| Sample Taken Date | 05/12/2026 | Sample Unique Key | 31 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 05/12/2026 | Sample type | Quality Assurance |
| A brief description of the sample | Compaction | The quantity of what the sample constitutes | 1 bag |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Jose Leon |
| Last name of sampler or witnessed by | Amparan | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Skyway exit | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | job site |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | 0+00 0+15 | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2026-05-12-31
DIME Test ID: 2026-05-12-31-1
Testing Lab: CT D04 - Richmond Field Laboratory
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2026-05-13
Test Results
Is oversize material: No
Input Type: Measured
Tester's full name: Jose Leon Amparan
Date of test: 05/12/2026
In-place wet density: 2.13
Highest adjust wet density: 2.21
% Moisture: 10.3 %
Optimum Moisture: 6.0 %
Relative compaction: 96
General comments (publicly viewable) (Max 1000 characters): Passed
Test was verified on 5/13/2026 ✔
