Summary for Test 2026-05-06-20-6
Test performed: CTM 518-June 2010Project Information
| Project Identifiers | Project ID: 1001281 DEA: 11430234 EFIS: 1118000029 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-805-0.1/14.6 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | REPLACE CONC PVMT, CONSTRUCT AUX LANE & BIKE TRAIL, ELECT, & LANDSCAPE |
| Location Description | SAN DIEGO COUNTY IN SAN DIEGO, CHULA VISTA AND NATIONAL CITY FROM 0.3 MILE SOUTH OF ROUTE 805/5 SEPARATION TO ROUTE 805/15 SEPARATION |
| QA Service Level | 1 (Verified on 06/09/2025) |
Sample Information
| Sample Taken Date | 05/06/2026 | Sample Unique Key | 20 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/06/2026 |
| Sample type | Quality Assurance | A brief description of the sample | Field Sample |
| The quantity of what the sample constitutes | Field Sample | From where was the sample collected | Source |
| First name of sampler or witnessed by | Gerardo | Last name of sampler or witnessed by | Cordero |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Bid Item 165 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Associated Otay | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 556300 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 1 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Field Sample | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2026-05-06-20
DIME Test ID: 2026-05-06-20-6
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2026-05-08
Test Results
Input Type: Calculated
Tester's full name: Gerardo Cordero
Date of test: 05/06/2026
Unit weight of the concrete: 147 lb/ft^3
Cement content: 590 lb/yd^3
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/8/2026 ✔