Summary for Test 2026-04-17-4-3

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 994443
DEA: 053307C4
EFIS: 0514000028
DIST-CO-RTE-PM05-SLO-41,46-44.5/45.3,54.0/57.8
Award Date02/27/2023
Closeout DateNot set
Work DescriptionWye Segment - Route 41/46 Separation
Location DescriptionNot set
QA Service Level1 (Verified on 12/16/2022)

Sample Information

Sample Taken Date04/17/2026 Sample Unique Key4
Date that the sample was received by the laboratory/organization performing the testing04/17/2026 Sample typeAcceptance
A brief description of the sampleSkid Test Request The quantity of what the sample constitutesMultiple Lanes
From where was the sample collectedJob Site First name of sampler or witnessed byCristian
Last name of sampler or witnessed bySuarez Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameATKINSON CONSTRUCTION
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier49-0277 R Structure nameCholame Creek Overflow Bridge Right
Bid Item3857483

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedBehind K-Rail/Barrier DIST-CO-RTE05-SLO-46
Direction of TravelEast Post Mile
Lanes to be TestedShoulder,Lane #1,Lane #2,Lane #3 Station55.18

Test Details

DIME Sample ID: 2026-04-17-4
DIME Test ID: 2026-04-17-4-3
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2026-05-06

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 05/06/2026
Air Temperature: 67
Tire Pressure: 25
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: COOL
Direction/Lane #: NB: Northbound Direction of Travel
Edge used to measure reference distance: BEGIN BRIDGE
Edge used to measure position: RIGHT OF BARRIER
Reference Distance 1: 155
Reference Distance 2: 158
Reference Distance 3: 161
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 13
Position for Stationing 2: 13
Position for Stationing 3: 13
Percent Grade for 1st Stationing: 1.0
Percent Grade for 2nd Stationing: 1.0
Percent Grade for 3rd Stationing: 1.0
Corrected Coefficients of Friction for Stationing 1: 0.35
Corrected Coefficients of Friction for Stationing 2: 0.38
Corrected Coefficients of Friction for Stationing 3: 0.41
Average Coefficient of Friction: 0.38
General comments (publicly viewable) (Max 1000 characters): CHOLAME BRIDGE. APPROACH SLAB COMPLIES WITH READINGS OF:.36-.36-.38=.37 AVG DEPARTURE SLAB COMPLIES WITH READINGS OF:.41-.41-.41= .41 AVG SHOULDERS DID NOT NEED TO BE TESTED PER CONTRACTOR

Test was verified on 5/6/2026 ✔