Summary for Test 2026-04-17-42-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 995493 DEA: 081G6704 EFIS: 0816000049 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-79-5.4/11.4 |
| Award Date | 05/23/2024 |
| Closeout Date | Not set |
| Work Description | HOT MIX ASPHALT, SOIL NAIL, STRUCTURAL CONCRETE AND ROADWAY EXC. |
| Location Description | RIVERSIDE COUNTY NEAR TEMECULA FROM 0.4 MILE SOUTH OF SAGE ROAD TO 1.1 MILES SOUTH OF PAUBA ROAD |
| QA Service Level | 1 (Verified on 12/18/2023) |
Sample Information
| Sample Taken Date | 04/17/2026 | Sample Unique Key | 42 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/17/2026 |
| Sample type | Acceptance | A brief description of the sample | Native Subgrade |
| The quantity of what the sample constitutes | 25.2 kg | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Dylan | Last name of sampler or witnessed by | Nault |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Rte 79 SB, RW 343 Footing, Sta 340+35 - 344+06 | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2026-04-17-42
DIME Test ID: 2026-04-17-42-1
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2026-05-04
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Dylan Nault
Date of test: 04/17/2026
Gage No.: 36647
Test No.: 2
Nuclear By: Dylan Nault
Non-Bias Plan No.: 1
Depth: 8"
Material No.: no data
Material Type: Native Subgrade
Impact By: Dylan Nault
Standard Count Density: 1799 g/cc
Count or Density 1: 890 g/cc
Count or Density 2: 897 g/cc
Count or Density 3: 941 g/cc
Standard Count Moisture: 639 g/cc
Moisture Count 1: 75 g/cc
Moisture Count 2: 76 g/cc
Moisture Count 3: 90 g/cc
Sum of Count or Density: 2728 g/cc
Average of Count or Density: 909 g/cc
Sum of Moisture Count: 241 g/cc
Average of Moisture Count: 80 g/cc
Count Ratio Density: 0.51
Count Ratio Moisture: 0.13
Calculated Percent Relative Compaction: 96.1 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/4/2026 ✔
