Summary for Test 2026-04-21-26-1
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 1001123 DEA: 051H4704 EFIS: 0516000078 |
|---|---|
| DIST-CO-RTE-PM | 05-SCR-9-9-13.6,15.5 |
| Award Date | 09/05/2025 |
| Closeout Date | Not set |
| Work Description | REPLACE BRIDGES AND INSTALL MGS. |
| Location Description | SANTA CRUZ COUNTY NEAR BOULDER CREEK AT SAN LORENZO RIVER BRIDGE AND AT KINGS CREEK BRIDGE |
| QA Service Level | 1 (Verified on 04/10/2025) |
Sample Information
| Sample Taken Date | 04/21/2026 | Sample Unique Key | 26 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 04/22/2026 |
| Sample type | Quality Assurance | A brief description of the sample | Double Barrel Couplers #4 |
| The quantity of what the sample constitutes | NA | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Stacey | Last name of sampler or witnessed by | Davis |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | C&N Reinforcing | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | CMC |
| Coupler Manufacturer | Bar Splice | Intermediate Assembler or Fabricator | |
| Rebar Size | #4 | Coupler Model | Double Barrel Zap Screwlok |
| Coating Standards | ASTM A934 epoxy | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | 1043 | Rebar Heat Number(s) | 4156763 |
| Rebar Size 2 | Coupler Unique ID | SB-17-02 |
Test Details
DIME Sample ID: 2026-04-21-26
DIME Test ID: 2026-04-21-26-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2026-05-04
Test Results
Number of Samples: 4
Input Type: Measured
Tester's full name: Steven Paine
Date of test: 05/04/2026
UTM: NA
Halo ID: na
Temperature: 0 f
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | 1 | 4 | 0.20 | 0000 | 19195 | 95980 | service splice | WSP |
| 2 | 2 | 1 | 4 | 0.20 | 0000 | 18810 | 94050 | service splice | WSP |
| 3 | 3 | 1 | 4 | 0.20 | 0000 | 19025 | 95130 | service splice | WSP |
| 4 | 4 | 1 | 4 | 0.20 | 0000 | 18700 | 93500 | service splice | WSP |
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/4/2026 ✔
