Summary for Test 2026-02-27-53-4
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 1000785 DEA: 081J3204 EFIS: 0818000017 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-74-17.8 |
| Award Date | 05/29/2025 |
| Closeout Date | Not set |
| Work Description | BUILDING WORK, WROUGHT IRON FENCE, HOT MIX ASPHALT, & AGGREGATE BASE. |
| Location Description | RIVERSIDE COUNTY NEAR LAKE ELSINORE AT LAKE ELSINORE MAINTENANCE STATION AT 18745 CONARD AVENUE |
| QA Service Level | 1 (Verified on 01/13/2025) |
Sample Information
| Sample Taken Date | 02/27/2026 | Sample Unique Key | 53 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 02/27/2026 | Sample type | Acceptance |
| A brief description of the sample | 1"xNo.4, 3/8"xNo.8, & WCS Aggregate PCC | The quantity of what the sample constitutes | 30 CY |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Maqsud |
| Last name of sampler or witnessed by | Ahmed | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Robertson's Ready Mix — Murietta | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-36-0072, 91-33-0061 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Conveyor Belt | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
| The concrete mix design number | SC590B33 | Lot number | |
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2026-02-27-53
DIME Test ID: 2026-02-27-53-4
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2026-04-28
Test Results
Number of tests: 2
Input Type: Measured
Tester's full name: Dylan Nault
Date of test: 03/02/2026
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 4.7
Sand reading (test 1): 3.5
Clay reading (test 2): 4.6
Sand reading (test 2): 3.5
Sand equivalent (test 1): 75
Sand equivalent (test 2): 77
Sand equivalent before temperature correction: 76
Sand equivalent after temperature correction: 76
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/28/2026 ✔
