Summary for Test 2026-04-01-83-2
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 1001224 DEA: 070Y1504 EFIS: 0724000136 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-15.11/18.82 |
| Award Date | 06/26/2025 |
| Closeout Date | Not set |
| Work Description | INDIVIDUAL SLAB REPLACEMENT, DIGOUTS, AND SLURRY SEAL. |
| Location Description | LOS ANGELES COUNTY IN LOS ANGELES AT VARIOUS LOCATIONS FROM 0.2 MILE EAST OF ESPERANZA STREET UNDERCROSSING TO MISSION ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 07/02/2025) |
Sample Information
| Sample Taken Date | 04/01/2026 | Sample Unique Key | 83 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/07/2026 | Sample type | Verification |
| A brief description of the sample | Asphalt Binder Sample | The quantity of what the sample constitutes | 1can |
| From where was the sample collected | Source | First name of sampler or witnessed by | VICTOR |
| Last name of sampler or witnessed by | Pham | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | AAA-Irwindale | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-10 |
|---|---|---|---|
| Modified | Lot number | ||
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | ||
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2026-04-01-83
DIME Test ID: 2026-04-01-83-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2026-05-21
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Angelito Villegas
Date of test: 04/27/2026
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 203.191 grams
Mass of container #2 before test (m2i): 207.040 grams
Mass of container #1 after test (m1f): 203.233 grams
Mass of container #2 after test (m2f): 207.051 grams
Mass of empty container #1: 168.214 grams
Mass of empty container #2: 171.918 grams
Mass correction factor: 0.006
Average mass change: 0.082 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/21/2026 ✔
