Summary for Test 2026-04-24-21-2

Test performed: ASTM C1611-21

Project Information

Project IdentifiersProject ID: 1000970
DEA: 031J6304
EFIS: 0321000023
DIST-CO-RTE-PM03-SAC-99-6.04/7.06
Award DateNot set
Closeout DateNot set
Work DescriptionWILLOW SLOUGH REPLACEMENT
Location DescriptionSACRAMENTO COUNTY NEAR ELK GROVE FROM 0.2 MILE NORTH OF ARNO ROAD TO 0.4 MILE SOUTH OF DILLARD ROAD
QA Service Level1 (Verified on 02/13/2025)

Sample Information

Sample Taken Date04/24/2026 Sample Unique Key21
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/24/2026
Sample typeQuality Control A brief description of the sample1 cubic foot
The quantity of what the sample constitutes1 cubic foot From where was the sample collectedFabricator
First name of sampler or witnessed byPatrick Last name of sampler or witnessed byWright
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameConFab Lathrop Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberL_85M1L
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected14127
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBed 1B, 2th Truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2026-04-24-21
DIME Test ID: 2026-04-24-21-2
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: ASTM C1611-21: Standard Test Method for Slump Flow of Self-Consolidating Concrete
Test Release Date: 2026-04-27

Test Results


What unit system is used for measurements?: inches
Input Type: Calculated
Tester's full name: Jerry Xiong
Date of test: 04/24/2026
Filling the mold procedure: Filling Procedure B (Inverted Mold)
Diameter 1: 20 in
Diameter 2: 20 in
Visual Stability Index: 0
Slump Flow: 20 in
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/27/2026