Summary for Test 2026-04-18-8-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 995228 DEA: 07347904 EFIS: 0718000123 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-405-31.2/41.4 |
| Award Date | 03/07/2025 |
| Closeout Date | Not set |
| Work Description | COLD PLANE, PLACE HMA, RHMA, JPCP, ISR, & REPLACE BRIDGE SLABS. |
| Location Description | LOS ANGELES FROM WILSHIRE BOULEVARD UNDERCROSSING TO VICTORY BOULEVARD UNDERCROSSING |
| QA Service Level | 1 (Verified on 01/22/2024) |
Sample Information
| Sample Taken Date | 04/18/2026 | Sample Unique Key | 8 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/18/2026 |
| Sample type | Quality Assurance | A brief description of the sample | Aggregate Base |
| The quantity of what the sample constitutes | 1035 SY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Abdallah | Last name of sampler or witnessed by | Osselly |
| Title of sampler | Field Technicain | Telephone number of sampler | 714-244-2460 |
| Laboratory sample identification | 26-1347 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Existing Aggregate Base | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | CTM 231 test location | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2026-04-18-8
DIME Test ID: 2026-04-18-8-1
Testing Lab: Kleinfelder, Incorporated - Los Angeles
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2026-04-22
Test Results
Method Type:: Standard Count
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Abdallah Osselly
Date of test: 04/18/2026
Sum of Count or Density: 4491 g/cc
Average of Count or Density: 998 g/cc
Sum of Moisture Count: 1041 g/cc
Average of Moisture Count: 208 g/cc
Count Ratio Density: 2.16
Count Ratio Moisture: 0.25
Calculated Percent Relative Compaction: 94.7 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/22/2026 ✔
