Summary for Test 2026-04-15-18-2

Test performed: CTM 216-June 2011

Project Information

Project IdentifiersProject ID: 994583
DEA: 07333604
EFIS: 0716000313
DIST-CO-RTE-PM07-LA-2-2.3/14.2
Award Date11/26/2024
Closeout DateNot set
Work DescriptionCOLD PLANE AC, PLACE HMA, REPLACE CURB RAMPS AND TRAFFIC SIGNALS.
Location DescriptionLOS ANGELES COUNTY IN LOS ANGELES AT VARIOUS LOCATIONS FROM CENTINELA AVENUE TO GLENDALE BOULEVARD UNDERCROSSING
QA Service Level1 (Verified on 07/24/2023)

Sample Information

Sample Taken Date04/15/2026 Sample Unique Key18
Date that the sample was received by the laboratory/organization performing the testing04/15/2026 Sample typeAcceptance
A brief description of the sampleAggregate Base The quantity of what the sample constitutes115 SF
From where was the sample collectedJob Site First name of sampler or witnessed byMichelangelo
Last name of sampler or witnessed bySese Title of samplerTET
Telephone number of sampler310-345-6204 Laboratory sample identification26-1307
Linked DIME Sample ID The fabricator/manufacturer/facility nameNA
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2026-04-15-18
DIME Test ID: 2026-04-15-18-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2026-04-15

Test Results


Is oversize material: No
Input Type: Measured
Tester's full name: Michelangelo Sese
Date of test: 04/15/2026
In-place wet density: 2.01
Highest adjust wet density: 2.11
% Moisture: 5.1 %
Optimum Moisture: no data
Relative compaction: 95
General comments (publicly viewable) (Max 1000 characters): EB State Rte. 2 Santa Monica Blvd. Sidewalk

Test was verified on 4/15/2026 ✔