Summary for Test 2026-04-14-9-2
Test performed: AASHTO T308-25Project Information
| Project Identifiers | Project ID: 995236 DEA: 060U2904 EFIS: 0616000001 |
|---|---|
| DIST-CO-RTE-PM | 06-KER-184-1.1/8.3 |
| Award Date | 08/14/2025 |
| Closeout Date | Not set |
| Work Description | COLD PLANE & OVERLAY WITH HMA/RHMA, CONSTRUCT SIDEWALKS & CURB RAMPS. |
| Location Description | KERN COUNTY NEAR BAKERSFIELD FROM WHARTON AVENUE TO EDISON HIGHWAY |
| QA Service Level | 1 (Verified on 12/18/2024) |
Sample Information
| Sample Taken Date | 04/14/2026 | Sample Unique Key | 9 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/15/2026 |
| Sample type | Acceptance | A brief description of the sample | 1/2" HMA- A with 15% Rap |
| The quantity of what the sample constitutes | 750 tons L2SL3 | From where was the sample collected | Source |
| First name of sampler or witnessed by | Alex | Last name of sampler or witnessed by | Escobar |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Griffith Edmonston | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | 3936550 |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | 2 |
| Sublot number | 3 | HMA Mix Number | |
| Binder content (%) | 4.9 | Virgin binder PG | PG 64-16 |
| Design binder PG | PG 64-16 | Binder Supplier | |
| RAP content (%) | Not set | WMA Additives | No |
| Antistrip type | .8% Lime |
Test Details
DIME Sample ID: 2026-04-14-9
DIME Test ID: 2026-04-14-9-2
Testing Lab: CT D06 - Bakersfield Field Laboratory
Test Method: AASHTO T308-25: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2026-04-15
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Measured
Tester's full name: Alex Escobar
Date of test: 04/15/2026
Test procedure used?: Method A
Mass of the specimen basket assembly: 3977.0 g
Mass of the specimen and specimen basket assembly prior to ignition: 5510.1 g
Mass of HMA Sample prior to ignition: 1533.1 g
Mass Loss: 81.6 g
Mass of aggregate remaining after ignition: 1451.5 g
Correction Factor (Percent by mass of HMA Specimen): 0.74 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 F
Corrected Asphalt Binder Content: 4.58 %
General comments (publicly viewable) (Max 1000 characters):
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| 06-0U2904_37043_260414_T308_L2SL3 | 154.28 KB | 04/15/2026 | 2026-04-14-9-2 | Info |
Test was verified on 4/15/2026 ✔
