Summary for Test 2026-04-10-15-8
Test performed: CTM 556-January 2018Project Information
| Project Identifiers | Project ID: 1000320 DEA: 11430324 EFIS: 1118000102 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-805-14.6/23.7 |
| Award Date | 08/23/2024 |
| Closeout Date | Not set |
| Work Description | MODIFY ELECTRICAL, CONCRETE PAVEMENT, DRAINAGE AND SIGNS. |
| Location Description | SAN DIEGO COUNTY IN SAN DIEGO FROM ROUTE 805/15 SEPARATION TO 0.1 MILE NORTH OF ROUTE 805/52 SEPARATION |
| QA Service Level | 1 (Verified on 09/09/2024) |
Sample Information
| Sample Taken Date | 04/10/2026 | Sample Unique Key | 15 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/10/2026 |
| Sample type | Quality Assurance | A brief description of the sample | Field Sample |
| The quantity of what the sample constitutes | Field Sample | From where was the sample collected | Source |
| First name of sampler or witnessed by | Eddie | Last name of sampler or witnessed by | Bidinger |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Robertson's Miramar | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | RRM 21123 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 1 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Field Sample | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2026-04-10-15
DIME Test ID: 2026-04-10-15-8
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: CTM 556-January 2018: Method of Test for Slump of Fresh Portland Cement Concrete
Test Release Date: 2026-04-17
Test Results
Input Type: Calculated
Tester's full name: Eddie Bidinger
Date of test: 04/10/2026
Slump: 10.25 inch
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/17/2026 ✔