Summary for Test 2026-04-06-22-2
Test performed: AASHTO T308-25Project Information
| Project Identifiers | Project ID: 1001224 DEA: 070Y1504 EFIS: 0724000136 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-15.11/18.82 |
| Award Date | 06/26/2025 |
| Closeout Date | Not set |
| Work Description | INDIVIDUAL SLAB REPLACEMENT, DIGOUTS, AND SLURRY SEAL. |
| Location Description | LOS ANGELES COUNTY IN LOS ANGELES AT VARIOUS LOCATIONS FROM 0.2 MILE EAST OF ESPERANZA STREET UNDERCROSSING TO MISSION ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 07/02/2025) |
Sample Information
| Sample Taken Date | 04/06/2026 | Sample Unique Key | 22 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/07/2026 |
| Sample type | Acceptance | A brief description of the sample | 3/4 HMA-A |
| The quantity of what the sample constitutes | 750 Tons | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Baher | Last name of sampler or witnessed by | Fakhoury |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | 26-079 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | AAA Irwindale | Transportation Laboratory (TL) Number | 4062026 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | 105793 | |
| Binder content (%) | 0.0 | Virgin binder PG | |
| Design binder PG | Binder Supplier | ||
| RAP content (%) | Not set | WMA Additives | |
| Antistrip type |
Test Details
DIME Sample ID: 2026-04-06-22
DIME Test ID: 2026-04-06-22-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: AASHTO T308-25: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2026-04-09
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Daniel Gomez
Date of test: 04/08/2026
Test procedure used?: Method A
Mass of the specimen basket assembly: 4056.0 g
Mass of the specimen and specimen basket assembly prior to ignition: 6109.9 g
Mass of HMA Sample prior to ignition: 2053.9 g
Mass Loss: 95.6 g
Mass of aggregate remaining after ignition: 1958.3 g
Correction Factor (Percent by mass of HMA Specimen): 0.12 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 4.53 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/9/2026 ✔