Summary for Test 2026-04-08-20-1

Test performed: AASHTO T11-5

Project Information

Project IdentifiersProject ID: 1001575
DEA: 061H9604
EFIS: 0625000104
DIST-CO-RTE-PM06-KER-46,119-VAR
Award Date10/22/2025
Closeout Date10/07/2026
Work DescriptionCOLD PLANE AC PAVEMENT AND PLACING RHMA TYPE G.
Location DescriptionKERN COUNTY AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 09/15/2025)

Sample Information

Sample Taken Date04/08/2026 Sample Unique Key20
Date that the sample was received by the laboratory/organization performing the testing04/09/2026 Sample typeAcceptance
A brief description of the sample3/4" HMA- A The quantity of what the sample constitutesL1SL2- PSE sample per CTM 125
From where was the sample collectedSource First name of sampler or witnessed byAlex
Last name of sampler or witnessed byEscobar Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameGriffith Edmonston-Lebec
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid Item3933859

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-15-0068
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedcoldfeed
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1/2 inch
The concrete mix design number Lot number1
Sublot number2 Aggregate Mix Number

Test Details

DIME Sample ID: 2026-04-08-20
DIME Test ID: 2026-04-08-20-1
Testing Lab: CT D06 - Bakersfield Field Laboratory
Test Method: AASHTO T11-5: Standard Method of Test for Materials Finer Than 75-μm (No. 200) Sieve in Mineral Aggregates by Washing
Test Release Date: 2026-04-09

Test Results


Input Type: Measured
Tester's full name: Mike Cozad
Date of test: 04/09/2026
Which test procedure is being used: Method A
Mass of test sample (before test): 316.3 grams
Mass of test sample (after test): 285.9 grams
Percent of sample passing the #200 sieve (by mass): 9.6 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/9/2026 ✔