Summary for Test 2026-01-14-59-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 1000081 DEA: 081J5404 EFIS: 0818000069 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-15-2.4 |
| Award Date | 04/02/2025 |
| Closeout Date | Not set |
| Work Description | CB, JPCP (RSC), STRUCTURAL CONCRETE AND MODIFYING LIGHTING SYSTEMS. |
| Location Description | SAN BERNARDINO COUNTY IN ONTARIO AT ROUTE 10/15 SEPARATION |
| QA Service Level | 1 (Verified on 02/06/2024) |
Sample Information
| Sample Taken Date | 01/14/2026 | Sample Unique Key | 59 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/14/2026 |
| Sample type | Acceptance | A brief description of the sample | Native Structural Backfill |
| The quantity of what the sample constitutes | 24.2 kg | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Dylan | Last name of sampler or witnessed by | Nault |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CTM 231 Test Locations | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | I-15 SB to I-10 EB Connector, EB Approach Slab, Sta 137+45 - 137+75 | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2026-01-14-59
DIME Test ID: 2026-01-14-59-1
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2026-04-07
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Dylan Nault
Date of test: 01/14/2026
Gage No.: 36647
Test No.: 1
Nuclear By: Dylan Nault
Non-Bias Plan No.: 1
Depth: 8"
Material No.: no data
Material Type: Native Structural Backfill
Impact By: Dylan Nault
Standard Count Density: 1781 g/cc
Count or Density 1: 771 g/cc
Count or Density 2: 952 g/cc
Count or Density 3: 910 g/cc
Standard Count Moisture: 657 g/cc
Moisture Count 1: 108 g/cc
Moisture Count 2: 136 g/cc
Moisture Count 3: 118 g/cc
Sum of Count or Density: 2633 g/cc
Average of Count or Density: 878 g/cc
Sum of Moisture Count: 362 g/cc
Average of Moisture Count: 121 g/cc
Count Ratio Density: 0.49
Count Ratio Moisture: 0.18
Calculated Percent Relative Compaction: 97.4 %
Reported Percent Relative Compaction: 97 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/7/2026 ✔
