Summary for Test 2026-03-31-13-2

Test performed: CTM 375-February 2012

Project Information

Project IdentifiersProject ID: 994443
DEA: 053307C4
EFIS: 0514000028
DIST-CO-RTE-PM05-SLO-41,46-44.5/45.3,54.0/57.8
Award Date02/27/2023
Closeout DateNot set
Work DescriptionWye Segment - Route 41/46 Separation
Location DescriptionNot set
QA Service Level1 (Verified on 12/16/2022)

Sample Information

Sample Taken Date03/31/2026 Sample Unique Key13
Date that the sample was received by the laboratory/organization performing the testing03/31/2026 Sample typeAcceptance
A brief description of the sample3 HMA cores The quantity of what the sample constitutes750 Tons
From where was the sample collectedJob Site First name of sampler or witnessed byTyler
Last name of sampler or witnessed byGraber Title of samplerSPM QC
Telephone number of sampler Laboratory sample identification260331-L8SL4 ABC
Linked DIME Sample ID The fabricator/manufacturer/facility nameGranite Construction - Arvin Plant
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid Item3857461

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number8
Sublot number4 HMA Mix Number14609
Binder content (%)0.0 Virgin binder PG
Design binder PG Binder Supplier
RAP content (%)Not set WMA Additives
Antistrip type

Test Details

DIME Sample ID: 2026-03-31-13
DIME Test ID: 2026-03-31-13-2
Testing Lab: CT D05 - Whitley Gardens Field Laboratory
Test Method: CTM 375-February 2012: Determining the Density and Relative Compaction of Data Cores (lab)
Test Release Date: 2026-04-02

Test Results


Number of Cores: 1
Input Type: Measured
Tester's full name: Kyle Engen
Date of test: 04/02/2026
1
2.538
L8 SL4B
1038.9 grams
1055.3 grams
601.8 grams

2.387

94.1 %
General comments (publicly viewable) (Max 1000 characters): Performed under T275 L8 SL4B

Test was verified on 4/2/2026 ✔