Summary for Test 2026-03-25-30-3
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 993812 DEA: 11431274 EFIS: 1121000129 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-5-R0.3/R36.0 |
| Award Date | 01/28/2025 |
| Closeout Date | Not set |
| Work Description | CMGC Project- Restore the pavement to a state of good repair through roadway rehabilitation, pavement preservation, drainage restoration, transportation management system upgrades, and American with Disabilities Act (ADA) infrastructure improvements. |
| Location Description | SD County |
| QA Service Level | 1 (Verified on 09/19/2022) |
Sample Information
| Sample Taken Date | 03/25/2026 | Sample Unique Key | 30 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 03/26/2026 | Sample type | Quality Assurance |
| A brief description of the sample | Daily Production | The quantity of what the sample constitutes | 2 boxes |
| From where was the sample collected | Supplier | First name of sampler or witnessed by | Mohammed |
| Last name of sampler or witnessed by | Masud | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Martin Marietta Lakeside | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | |
| Sublot number | HMA Mix Number | 21218180AH | |
| Binder content (%) | 0.0 | Virgin binder PG | |
| Design binder PG | Binder Supplier | Valero | |
| RAP content (%) | 0 | WMA Additives | No |
| Antistrip type |
Test Details
DIME Sample ID: 2026-03-25-30
DIME Test ID: 2026-03-25-30-3
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2026-04-02
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Measured
Tester's full name: Melchor Oronoz
Date of test: 04/03/2026
Test procedure used?: Method A
Mass of the specimen basket assembly: 4042.2 g
Mass of the specimen and specimen basket assembly prior to ignition: 5570.5 g
Mass of HMA Sample prior to ignition: 1528.3 g
Mass Loss: 116.1 g
Mass of aggregate remaining after ignition: 1412.2 g
Correction Factor (Percent by mass of HMA Specimen): 0.03 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 F
Corrected Asphalt Binder Content: 7.57 %
General comments (publicly viewable) (Max 1000 characters): Complies, Tested 7.57%,
Target 7.5%
Test was verified on 4/2/2026 ✔