Summary for Test 2026-03-23-19-7

Test performed: AASHTO T269-14

Project Information

Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date03/23/2026 Sample Unique Key19
Date that the sample was received by the laboratory/organization performing the testing03/24/2026 Sample typeVerification
A brief description of the sampleJMFR The quantity of what the sample constitutes12 boxes
From where was the sample collectedSupplier First name of sampler or witnessed byEddie
Last name of sampler or witnessed byBidinger Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameMartin Marietta Lake Elsinore
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number HMA Mix Number53417195
Binder content (%)0.0 Virgin binder PG
Design binder PG Binder SupplierValero
RAP content (%)0 WMA AdditivesNo
Antistrip type

Test Details

DIME Sample ID: 2026-03-23-19
DIME Test ID: 2026-03-23-19-7
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2026-04-03

Test Results


Number of tests: 3
Is the sample lab compacted or field compacted?: Lab compacted
Input Type: Measured
Tester's full name: Daniel Smith
Date of test: 04/01/2026
123
2.347 2.340 2.342
2.469

4.9 %

5.2 %

5.1 %

5.1 %
General comments (publicly viewable) (Max 1000 characters): Complies Target 4.0% +/- 1.5% Tested an Avg of 5.1 %

Test was verified on 4/3/2026