Summary for Test 2025-10-24-60-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 1000665 DEA: 081K4004 EFIS: 0819000031 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-15-3.5/6.8 |
| Award Date | 01/29/2025 |
| Closeout Date | Not set |
| Work Description | HMA (TYPE A), RDWY EXC, STR CONC RET WALL, RUBBERIZED HMA (OGFC). |
| Location Description | TEMECULA FROM 0.1 MI NORTH OF TEMECULA PARKWAY TO 0.2 MI NORTH OF WINCHESTER ROAD |
| QA Service Level | 1 (Verified on 01/13/2025) |
Sample Information
| Sample Taken Date | 10/24/2025 | Sample Unique Key | 60 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/24/2025 |
| Sample type | Acceptance | A brief description of the sample | Native Subgrade |
| The quantity of what the sample constitutes | 19.4 kg | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Alberto | Last name of sampler or witnessed by | Pineda-Gonzalez |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | I-15 SB, Mainline & Shoulder, 1.90' Below Finish Grade, Sta 232+50 - 238+50 | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-10-24-60
DIME Test ID: 2025-10-24-60-1
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2026-03-19
Test Results
Method Type:: Standard Count
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Alberto Pineda-Gonzalez
Date of test: 10/24/2025
Gage No.: 33618
Test No.: 1
Nuclear By: Alberto Pineda-Gonzalez
Non-Bias Plan No.: 2
Depth: 12"
Material No.: no data
Material Type: Native Subgrade
Impact By: Alberto Pineda-Gonzalez
Standard Count Density: 1677 g/cc
Count or Density 1: 287 g/cc
Count or Density 2: 222 g/cc
Count or Density 3: 278 g/cc
Count or Density 4: 232 g/cc
Count or Density 5: 215 g/cc
Standard Count Moisture: 693 g/cc
Moisture Count 1: 88 g/cc
Moisture Count 2: 93 g/cc
Moisture Count 3: 99 g/cc
Moisture Count 4: 162 g/cc
Moisture Count 5: 88 g/cc
Sum of Count or Density: 1234 g/cc
Average of Count or Density: 247 g/cc
Sum of Moisture Count: 530 g/cc
Average of Moisture Count: 106 g/cc
Count Ratio Density: 0.15
Count Ratio Moisture: 0.15
Calculated Percent Relative Compaction: 97.4 %
Reported Percent Relative Compaction: 97 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/19/2026 ✔
