Summary for Test 2026-03-16-4-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 993812 DEA: 11431274 EFIS: 1121000129 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-5-R0.3/R36.0 |
| Award Date | 01/28/2025 |
| Closeout Date | Not set |
| Work Description | CMGC Project- Restore the pavement to a state of good repair through roadway rehabilitation, pavement preservation, drainage restoration, transportation management system upgrades, and American with Disabilities Act (ADA) infrastructure improvements. |
| Location Description | SD County |
| QA Service Level | 1 (Verified on 09/19/2022) |
Sample Information
| Sample Taken Date | 03/16/2026 | Sample Unique Key | 4 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 03/16/2026 | Sample type | Quality Assurance |
| A brief description of the sample | Daily Production | The quantity of what the sample constitutes | 2 boxes |
| From where was the sample collected | Supplier | First name of sampler or witnessed by | Gerardo |
| Last name of sampler or witnessed by | Cordero | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Martin Marietta Lakeside | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | |
| Sublot number | HMA Mix Number | 21218180AH | |
| Binder content (%) | 0.0 | Virgin binder PG | |
| Design binder PG | Binder Supplier | Valero | |
| RAP content (%) | 0 | WMA Additives | No |
| Antistrip type |
Test Details
DIME Sample ID: 2026-03-16-4
DIME Test ID: 2026-03-16-4-2
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2026-03-27
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Mohammad Abbassi
Date of test: 03/20/2026
Test procedure used?: Method A
Mass of the specimen basket assembly: 3961.5 g
Mass of the specimen and specimen basket assembly prior to ignition: 5510.9 g
Mass of HMA Sample prior to ignition: 1549.4 g
Mass Loss: 118.0 g
Mass of aggregate remaining after ignition: 1431.4 g
Correction Factor (Percent by mass of HMA Specimen): 0.03 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 7.59 %
General comments (publicly viewable) (Max 1000 characters): Complies target 7.5 tested 7.65
Test was verified on 3/27/2026 ✔
