Summary for Test 2026-03-06-37-1

Test performed: AASHTO T30-25

Project Information

Project IdentifiersProject ID: 993595
DEA: 042Q5504
EFIS: 0419000024
DIST-CO-RTE-PM04-SOL-12-7.9/14.1
Award Date02/14/2025
Closeout DateNot set
Work DescriptionRHMA OVERLAY, REPLACE CULVERTS, BRIDGE RAILS, AND MEDIAN BARRIERS.
Location DescriptionSOLANO COUNTY NEAR SUISUN CITY FROM 0.2 MILE EAST OF LAWLER RANCH PARKWAY TO 0.5 MILE EAST OF SHILOH ROAD
QA Service Level1 (Verified on 02/22/2022)

Sample Information

Sample Taken Date03/06/2026 Sample Unique Key37
Date that the sample was received by the laboratory/organization performing the testing03/09/2026 Sample typeQuality Assurance
A brief description of the sample1/2" HMA-WMA The quantity of what the sample constitutes750 Tons
From where was the sample collectedManufacturer First name of sampler or witnessed byCody
Last name of sampler or witnessed byCordero Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameTeichert Woodland
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Teichert Woodland
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedBatch Plant Hot Bins
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1/2 inch
The concrete mix design number Lot number1
Sublot number10 Aggregate Mix Number

Test Details

DIME Sample ID: 2026-03-06-37
DIME Test ID: 2026-03-06-37-1
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: AASHTO T30-25: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2026-03-17

Test Results


Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Has the fine aggregate sample been reduced?: No
Is an aggregate correction factor used?: No
Was the aggregate obtained using ASTM D8159?: No
Input Type: Calculated
Tester's full name: Henry Concepcion
Date of test: 03/09/2026
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 96 %
Cumulative percent passing the 3/8 in. sieve: 88 %
Cumulative percent passing the #4 sieve: 52 %
Cumulative percent passing the #8 sieve: 40 %
Cumulative percent passing the #16 sieve: 24 %
Cumulative percent passing the #30 sieve: 17 %
Cumulative percent passing the #50 sieve: 13 %
Cumulative percent passing the #100 sieve: 11 %
Cumulative percent passing the #200 sieve: 8.4 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/17/2026 ✔