Summary for Test 2026-03-02-42-1

Test performed: CTM 518-June 2010

Project Information

Project IdentifiersProject ID: 993678
DEA: 042Q8004
EFIS: 0419000050
COOP: 042836,042944
DIST-CO-RTE-PM04-SM-101,92-US 101 & SR 92-10.9/12.1 & 11.8/13.4
Award Date01/22/2025
Closeout DateNot set
Work DescriptionUS 101/SR 92 INTERCHANGE AREA IMPROVEMENT :PROJECT WILL CONSTRUCT CONGESTION RELIEF IMPROVEMENTS AT THE US 101/SR 92 INTERCHANGE AREA.
Location DescriptionNot set
QA Service Level1 (Verified on 09/15/2022)

Sample Information

Sample Taken Date03/02/2026 Sample Unique Key42
Date that the sample was received by the laboratory/organization performing the testing03/02/2026 Sample typeQuality Control
A brief description of the sampleConcrete The quantity of what the sample constitutes100 CY
From where was the sample collectedJob Site First name of sampler or witnessed byHugo
Last name of sampler or witnessed bySerrano Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameGraniterock
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number57S750
The truck number from where the sample was collected2344 The batch plant ticket number from where the sample was collected151096
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedConcrete Truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2026-03-02-42
DIME Test ID: 2026-03-02-42-1
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2026-03-11

Test Results


Input Type: Calculated
Tester's full name: Hugo Serrano
Date of test: 03/02/2026
Unit weight of the concrete: 151.2 lb/ft^3
Cement content: 0 lb/yd^3
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/11/2026 ✔