Summary for Test 2025-08-20-129-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 1000607
DEA: 081K6904
EFIS: 0819000090
DIST-CO-RTE-PM08-RIV-74-5.7/11.8
Award Date01/09/2025
Closeout DateNot set
Work DescriptionROCK EXCAVATION, HMA (TYPE A), RHMA-G, AND CABLE NET DRAPERY SYSTEM.
Location DescriptionRIVERSIDE COUNTY IN AND NEAR LAKE ELSINORE FROM MONTE VISTA STREET TO GRAND AVENUE
QA Service Level1 (Verified on 01/13/2025)

Sample Information

Sample Taken Date08/20/2025 Sample Unique Key129
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/20/2025
Sample typeAcceptance A brief description of the sampleNative Embankment
The quantity of what the sample constitutes21.7 kg From where was the sample collectedJob Site
First name of sampler or witnessed byKristopher Last name of sampler or witnessed byMartinez
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCTM 231 Test Locations Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedSR-74, Embankment 1st Lift, Sta 628+00 - 629+00
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2025-08-20-129
DIME Test ID: 2025-08-20-129-1
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2026-03-09

Test Results


Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Kristopher Martinez
Date of test: 08/20/2025
Gage No.: 67731
Test No.: 1
Nuclear By: Kristopher Martinez
Non-Bias Plan No.: 3
Depth: 12"
Material No.: no data
Material Type: Embankment Backfill
Impact By: Kristopher Martinez
Standard Count Density: 1831 g/cc
Count or Density 1: 323 g/cc
Count or Density 2: 357 g/cc
Count or Density 3: 460 g/cc
Standard Count Moisture: 611 g/cc
Moisture Count 1: 158 g/cc
Moisture Count 2: 167 g/cc
Moisture Count 3: 119 g/cc
Sum of Count or Density: 1140 g/cc
Average of Count or Density: 380 g/cc
Sum of Moisture Count: 444 g/cc
Average of Moisture Count: 148 g/cc
Count Ratio Density: 0.21
Count Ratio Moisture: 0.24
Calculated Percent Relative Compaction: 91.2 %
Reported Percent Relative Compaction: 91 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/9/2026