Summary for Test 2026-03-06-1-7
Test performed: CTM 518-June 2010Project Information
| Project Identifiers | Project ID: 994901 DEA: 112T3434 EFIS: 1120000081 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-805-5.1/8.3 |
| Award Date | 01/29/2024 |
| Closeout Date | Not set |
| Work Description | SOUNDWALLS, WIDEN FREEWAY, STRUCTURES, LANDSCAPE AND ELECTRICAL. |
| Location Description | SAN DIEGO COUNTY IN CHULA VISTA FROM PALOMAR STREET OVERCROSSING TO 0.5 MILE NORTH OF BONITA ROAD UNDERCROSSING |
| QA Service Level | 1 (Verified on 03/21/2024) |
Sample Information
| Sample Taken Date | 03/06/2026 | Sample Unique Key | 1 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/06/2026 |
| Sample type | Quality Assurance | A brief description of the sample | Field Sample |
| The quantity of what the sample constitutes | Field Sample | From where was the sample collected | Source |
| First name of sampler or witnessed by | Eddie | Last name of sampler or witnessed by | Bidinger |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Associated Otay | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | RRM 23117 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 1 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Field Sample | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2026-03-06-1
DIME Test ID: 2026-03-06-1-7
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2026-03-09
Test Results
Input Type: Calculated
Tester's full name: Eddie Bidinger
Date of test: 03/06/2026
Unit weight of the concrete: 149.44 lb/ft^3
Cement content: 586 lb/yd^3
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/9/2026 ✔
