Summary for Test 2026-02-05-15-1
Test performed: CTM 521-June 2020Project Information
| Project Identifiers | Project ID: 1000541 DEA: 09374704 EFIS: 0918000019 |
|---|---|
| DIST-CO-RTE-PM | 09-INY-168,395-17.6/18.3,114.9/117.8 |
| Award Date | 02/21/2025 |
| Closeout Date | Not set |
| Work Description | HMA (TYPE A), MINOR CONCRETE, AND LIGHTING. |
| Location Description | INYO COUNTY IN AND NEAR BISHOP ON ROUTE 395 FROM 0.1 MILE SOUTH OF JAY STREET TO BARLOW LANE AND ON ROUTE 168 FROM PIONEER LANE TO ROUTE 395 |
| QA Service Level | 1 (Verified on 09/02/2024) |
Sample Information
| Sample Taken Date | 02/05/2026 | Sample Unique Key | 15 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/06/2026 |
| Sample type | Quality Assurance | A brief description of the sample | Head wall Bishop Pavement B-1 drainage |
| The quantity of what the sample constitutes | 4(6x12 cylinders | From where was the sample collected | Source |
| First name of sampler or witnessed by | Darrell | Last name of sampler or witnessed by | Biederman |
| Title of sampler | TET | Telephone number of sampler | 7609203898 |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | 7-11 Materials Bishop | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | B-1 drainage headwall | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 851456A6 |
|---|---|---|---|
| The truck number from where the sample was collected | 83993 | The batch plant ticket number from where the sample was collected | 956723 |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | From truck at b-1 drainage | Where the material sample would have been placed if not sampled | Headwall |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2026-02-05-15
DIME Test ID: 2026-02-05-15-1
Testing Lab: CT D09 - Bishop Field Laboratory
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2026-03-05
Test Results
Unit system used?: US Units
Number of specimens: 2
Test performed: With no density determined
Input Type: Measured
Tester's full name: Derek Carrington
Date of test: 03/05/2026
Capped in accordance with?: ASTM C617 - Sulfur Mortar Cap
Average diameter of cylinder 1: 6.01 in
Average diameter of cylinder 2: 6.01 in
Maximum load on cylinder 1: 117510 lb
Maximum load on cylinder 2: 121630 lb
Type of fracture pattern of cylinder 1: 1
Type of fracture pattern of cylinder 2: 1
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1.00
Correction factor for cylinder 2: 1.00
Age of specimen: 28 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 28.37 in^2
Cross sectional area of cylinder 2: 28.37 in^2
Compressive strength of cylinder 1: 4142.1 psi
Compressive strength of cylinder 2: 4287.3 psi
Compressive strength (to nearest 10 psi): 4210 psi
General comments (publicly viewable) (Max 1000 characters): PCC-005 28 Day Breaks
Test was verified on 3/5/2026 ✔
