Summary for Test 2026-03-03-2-2
Test performed: CTM 504-June 2010Project Information
| Project Identifiers | Project ID: 1000703 DEA: 11430194 EFIS: 1118000001 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-15-0.4/R10.2 |
| Award Date | 04/16/2025 |
| Closeout Date | Not set |
| Work Description | CULVERT RESTORATION, TUNNEL CO MONITORING SYSTEM, & ADA RAMP. |
| Location Description | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.2 MILE SOUTH OF ROUTE 5/15 SEPARATION TO 0.4 MILE SOUTH OF ROUTE 52/15 SEPARATION. |
| QA Service Level | 1 (Verified on 07/23/2025) |
Sample Information
| Sample Taken Date | 03/03/2026 | Sample Unique Key | 2 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/03/2026 |
| Sample type | Quality Assurance | A brief description of the sample | Field Sample |
| The quantity of what the sample constitutes | Field Sample | From where was the sample collected | Source |
| First name of sampler or witnessed by | Daniel Paul | Last name of sampler or witnessed by | Smith |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CalPortland Miramar | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 00336362 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 1 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Field Sample | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2026-03-03-2
DIME Test ID: 2026-03-03-2-2
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2026-03-05
Test Results
Input Type: Calculated
Tester's full name: Gerardo Cordero
Date of test: 03/03/2026
Air Content: 1.3 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/5/2026 ✔
