Summary for Test 2026-02-28-2-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 1001440
DEA: 07370804
EFIS: 0720000139
DIST-CO-RTE-PM07-LA-5-30.6/31.6
Award DateNot set
Closeout DateNot set
Work DescriptionREMOVE CONCRETE PAVEMENT AND BASE, AND PLACE JPCP.
Location DescriptionLOS ANGELES COUNTY IN BURBANK FROM 0.2 MILE NORTH OF SAN FERNANDO BOULEVARD TO 0.2 MILE SOUTH OF COHASSET STREET
QA Service Level1 (Verified on 08/15/2025)

Sample Information

Sample Taken Date02/28/2026 Sample Unique Key2
Date that the sample was received by the laboratory/organization performing the testing02/28/2026 Sample typeAcceptance
A brief description of the sampleAggregate Base The quantity of what the sample constitutes16248 SF
From where was the sample collectedJob Site First name of sampler or witnessed byMichelangelo
Last name of sampler or witnessed bySese Title of samplerTET
Telephone number of sampler310-345-6204 Laboratory sample identification26-0733
Linked DIME Sample ID The fabricator/manufacturer/facility nameNA
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2026-02-28-2
DIME Test ID: 2026-02-28-2-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2026-03-01

Test Results


Method Type:: Direct Read
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Michelangelo Sese
Date of test: 02/28/2026
Gage No.: 60203
Test No.: no data
Nuclear By: Michelangelo Sese
Non-Bias Plan No.: 4
Depth: 5
Material No.: no data
Material Type: Aggregate Base
Impact By: Michelangelo Sese
Standard Count Density: 2214 g/cc
Count or Density 1: 2.07 g/cc
Count or Density 2: 2.13 g/cc
Count or Density 3: 2.12 g/cc
Count or Density 4: 2.07 g/cc
Count or Density 5: 2.06 g/cc
Standard Count Moisture: 646 g/cc
Moisture Count 1: 0.17 g/cc
Moisture Count 2: 0.17 g/cc
Moisture Count 3: 0.15 g/cc
Moisture Count 4: 0.17 g/cc
Moisture Count 5: 0.14 g/cc
Sum of Count or Density: 10.45 g/cc
Average of Count or Density: 2.09 g/cc
Sum of Moisture Count: 0.8 g/cc
Average of Moisture Count: 0.16 g/cc
Calculated Percent Relative Compaction: 94.6 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters): NB Rte. 5 Line 1 & 2 from San Fernando Blvd to Buena Vista

Test was verified on 3/1/2026 ✔