Summary for Test 2025-11-17-21-3

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 993446
DEA: 120J34U4
EFIS: 1218000034
DIST-CO-RTE-PM12-ORA-55,55-29.6,R6.4/10.3
Award Date05/27/2022
Closeout DateNot set
Work DescriptionCONSTR BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS.
Location DescriptionORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 MILE SOUTH OF ROUTE 5/55 SEPARATION
QA Service Level1 (Verified on 06/24/2022)

Sample Information

Sample Taken Date11/17/2025 Sample Unique Key21
Date that the sample was received by the laboratory/organization performing the testing11/07/2025 Sample typeQuality Control
A brief description of the sample6 x 12 Concrete Cylinders The quantity of what the sample constitutes4
From where was the sample collectedJob Site First name of sampler or witnessed byRobert
Last name of sampler or witnessed byRomero Title of samplerQC Field Technician
Telephone number of sampler Laboratory sample identificationMix S63C453T13
Linked DIME Sample ID The fabricator/manufacturer/facility nameNational Ready Mix
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberS63C453T13
The truck number from where the sample was collectedLoad 1 The batch plant ticket number from where the sample was collectedUnknown
Concrete batch plant The fabricator/manufacturer designation for the sampleMix S63C453T13
A detailed description of where the material sample was collectedBarrier Wall 836A, Truck 20060 Where the material sample would have been placed if not sampled
From Lot No.1 Bag Lot No.1

Test Details

DIME Sample ID: 2025-11-17-21
DIME Test ID: 2025-11-17-21-3
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2026-02-26

Test Results


Input Type: Calculated
Tester's full name: Robert Romero
Date of test: 11/17/2025
Air Content: 1.8 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 2/26/2026 ✔