Summary for Test 2026-02-11-19-5
Test performed: AASHTO T315-22Project Information
| Project Identifiers | Project ID: 995125 DEA: 101E3004 EFIS: 1018000273 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ-5-32.5/49.8 |
| Award Date | 01/12/2024 |
| Closeout Date | Not set |
| Work Description | REMOVE EXISTING PAVEMENT AND REPLACE WITH CONCRETE PAVEMENT. |
| Location Description | SAN JOAQUIN COUNTY IN AND NEAR STOCKTON FROM 0.2 MILE SOUTH OF HAMMER LANE UNDERCROSSING TO SACRAMENTO COUNTY LINE |
| QA Service Level | 1 (Verified on 09/26/2023) |
Sample Information
| Sample Taken Date | 02/11/2026 | Sample Unique Key | 19 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/11/2026 |
| Sample type | Verification | A brief description of the sample | Tank 19 |
| The quantity of what the sample constitutes | 1 of 1 | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Humberto | Last name of sampler or witnessed by | Ramirez |
| Title of sampler | Not set | Telephone number of sampler | Not set |
| Laboratory sample identification | 26-0211PNO-19 | Linked DIME Sample ID | Not set |
| The fabricator/manufacturer/facility name | Stockton, CA | Transportation Laboratory (TL) Number | Not set |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
| Structure name | Not set | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16/10 |
|---|---|---|---|
| Modified | Not set | Lot number | Not set |
| Sublot number | Not set | Tank number | Not set |
| Time of sample | Not set | HMA Supplier | Not set |
| Certified Asphalt Supplier | Pacific Northwest Oil | Multigrade | No |
| Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2026-02-11-19
DIME Test ID: 2026-02-11-19-5
Testing Lab: Pacific Northwest Oil
Test Method: AASHTO T315-22: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Test Release Date: 2026-02-25
Test Results
Phase: RTFO residue
Input Type: Calculated
Tester's full name: Apart
Date of test: 02/25/2026
Phase Angle (δ) (for the 10 cycles): no data
Dynamic Shear, G*/sin(δ): 3.34 kPa
General comments (publicly viewable) (Max 1000 characters): Submitted from ASCP bulk upload.
Test was verified on 2/25/2026 ✔
