Summary for Test 2025-12-12-53-2
Test performed: CTM 216-June 2011Project Information
| Project Identifiers | Project ID: 1000501 DEA: 081J6104 EFIS: 0818000102 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-215-40.5/42.7 |
| Award Date | 11/05/2024 |
| Closeout Date | Not set |
| Work Description | INDIVIDUAL SLAB REPLACEMENT (RSC), RHMA, AND REPLACE BASE. |
| Location Description | RIVERSIDE COUNTY IN RIVERSIDE FROM 0.8 MILE SOUTH OF ROUTE 60/91 SEPARATION TO 0.4 MILE SOUTH OF MARTIN LUTHER KING BOULEVARD UNDERCROSSING |
| QA Service Level | 1 (Verified on 09/02/2024) |
Sample Information
| Sample Taken Date | 12/12/2025 | Sample Unique Key | 53 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/12/2025 |
| Sample type | Acceptance | A brief description of the sample | Native Subgrade |
| The quantity of what the sample constitutes | 21.1 kg | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Dylan | Last name of sampler or witnessed by | Nault |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | NB I-215 / EB SR-60, University Ave, Vegetation Control | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-12-12-53
DIME Test ID: 2025-12-12-53-2
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2026-02-20
Test Results
Is oversize material: No
Input Type: Measured
Tester's full name: Dylan Nault
Date of test: 12/12/2025
In-place wet density: 2.08
Highest adjust wet density: 2.28
% Moisture: no data
Optimum Moisture: no data
Relative compaction: 91
General comments (publicly viewable) (Max 1000 characters): Density Spec 90%
Test was verified on 2/20/2026 ✔
