Summary for Test 2025-12-05-69-2
Test performed: CTM 216-June 2011Project Information
| Project Identifiers | Project ID: 1000785 DEA: 081J3204 EFIS: 0818000017 COOP: NONE |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-74-17.8 |
| Award Date | 05/29/2025 |
| Closeout Date | Not set |
| Work Description | BUILDING WORK, WROUGHT IRON FENCE, HOT MIX ASPHALT, & AGGREGATE BASE. |
| Location Description | RIVERSIDE COUNTY NEAR LAKE ELSINORE AT LAKE ELSINORE MAINTENANCE STATION AT 18745 CONARD AVENUE |
| QA Service Level | 1 (Verified on 01/13/2025) |
Sample Information
| Sample Taken Date | 12/05/2025 | Sample Unique Key | 69 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/05/2025 |
| Sample type | Acceptance | A brief description of the sample | Native Subgrade |
| The quantity of what the sample constitutes | 21.8 kg | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Gabriel | Last name of sampler or witnessed by | Ramirez |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | 2' Below FG, Building Foundation @ CalTrans Maintenance Station — Lake Elsinore | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-12-05-69
DIME Test ID: 2025-12-05-69-2
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2026-02-19
Test Results
Is oversize material: No
Input Type: Measured
Tester's full name: Gabriel Ramirez
Date of test: 12/05/2025
In-place wet density: 2.20
Highest adjust wet density: 2.30
% Moisture: no data
Optimum Moisture: no data
Relative compaction: 96
General comments (publicly viewable) (Max 1000 characters): Density Spec 95%
Test was verified on 2/19/2026 ✔
