Summary for Test 2026-02-02-16-6

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 994792
DEA: 051M5704
EFIS: 0520000029
COOP: 050427
DIST-CO-RTE-PM05-MON-218-0/1.0
Award DateNot set
Closeout DateNot set
Work DescriptionNot set
Location DescriptionNot set
QA Service Level2 (Verified on 12/11/2023)

Sample Information

Sample Taken Date02/02/2026 Sample Unique Key16
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing02/02/2026
Sample typeAcceptance A brief description of the sampleCT 342 Skid/Friction Test
The quantity of what the sample constitutesSkid test From where was the sample collectedJob Site
First name of sampler or witnessed byJessie Last name of sampler or witnessed byWilson
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameGraniterock Sand City Batch Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier44-0301
Structure name Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedN/A DIST-CO-RTE
Direction of Travel Post Mile0.90
Lanes to be Tested Station

Test Details

DIME Sample ID: 2026-02-02-16
DIME Test ID: 2026-02-02-16-6
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2026-02-09

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Jessie Wilson
Date of test: 02/02/2026
Air Temperature: 51 F
Tire Pressure: 25 psi
Equipment PST #: 0835
Is Calibration within ± values: Yes
Weather: Sunny
Direction/Lane #: EB: Eastbound Direction of Travel
Edge used to measure reference distance: Beginning of Bridge
Edge used to measure position: Left of Right Construction Edge
Reference Distance 1: 13 ft
Reference Distance 2: 16 ft
Reference Distance 3: 19 ft
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 8 ft
Position for Stationing 2: 8 ft
Position for Stationing 3: 8 ft
Percent Grade for 1st Stationing: -1.0 %
Percent Grade for 2nd Stationing: -1.0 %
Percent Grade for 3rd Stationing: -1.0 %
Corrected Coefficients of Friction for Stationing 1: 0.41
Corrected Coefficients of Friction for Stationing 2: 0.41
Corrected Coefficients of Friction for Stationing 3: 0.41
Average Coefficient of Friction: 0.41
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 2/9/2026