Summary for Test 2026-02-04-5-1

Test performed: ASTM C566-19

Project Information

Project IdentifiersProject ID: 1001329
DEA: 100X7404
EFIS: 1013000008
DIST-CO-RTE-PM10-CAL-12-17.1/17.5
Award Date09/03/2025
Closeout DateNot set
Work DescriptionBRIDGE REPLACEMENT.
Location DescriptionCALAVERAS COUNTY NEAR SAN ANDREAS FROM 0.2 MILE WEST OF NORTH FORK CALAVERAS RIVER BRIDGE TO 0.2 MILE EAST OF NORTH CALAVERAS RIVER BRIDGE
QA Service Level1 (Verified on 06/16/2025)

Sample Information

Sample Taken Date02/04/2026 Sample Unique Key5
Date that the sample was received by the laboratory/organization performing the testing02/04/2026 Sample typeQuality Control
A brief description of the sample1 Bucket of 1/2", 1 Bucket of 3/8", One Bucket of Sand The quantity of what the sample constitutes1 Bucket of 1/2", 1 Bucket of 3/8", One Bucket of Sand
From where was the sample collectedSource First name of sampler or witnessed byPatrick
Last name of sampler or witnessed byBaddu Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameConFab Lathrop
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Confab California Lathrop
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedStockpile @ Plant
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1/2 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2026-02-04-5
DIME Test ID: 2026-02-04-5-1
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: ASTM C566-19: Standard Test Method for Total Evaporable Moisture Content of Aggregate by Drying
Test Release Date: 2026-02-06

Test Results


Input Type: Calculated
Tester's full name: Patrick Wright
Date of test: 02/04/2026
Total evaporable moisture content: 3.4 %
General comments (publicly viewable) (Max 1000 characters): Sand 3.42%, 1/2" 1.91%, 3/8" 1.68%

Test was verified on 2/6/2026 ✔