Summary for Test 2026-01-14-35-1
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 1000207 DEA: 060Q4324 EFIS: 0619000026 COOP: 061730 |
|---|---|
| DIST-CO-RTE-PM | 06-TUL-190-13.1/16.6 |
| Award Date | 06/27/2025 |
| Closeout Date | Not set |
| Work Description | HMA, MINOR CONCRETE AND JPCP. |
| Location Description | TULARE COUNTY IN AND NEAR PORTERVILLE AT VARIOUS LOCATIONS FROM 0.2 MILE WEST OF WESTWOOD STREET TO 0.1 MILE EAST OF SOUTH MAIN STREET |
| QA Service Level | 1 (Verified on 03/25/2024) |
Sample Information
| Sample Taken Date | 01/14/2026 | Sample Unique Key | 35 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/27/2026 |
| Sample type | Quality Assurance | A brief description of the sample | binder |
| The quantity of what the sample constitutes | 1 can | From where was the sample collected | Source |
| First name of sampler or witnessed by | Frank | Last name of sampler or witnessed by | N/A |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Albina Chowchilla | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | 56378 | Structure unique identifier | |
| Structure name | Bid Item | 3932711 |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
|---|---|---|---|
| Modified | Lot number | ||
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | Albina Asphalt - Chowchilla CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2026-01-14-35
DIME Test ID: 2026-01-14-35-1
Testing Lab: WSP USA - Phoenix
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2026-02-04
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Erik Svensson
Date of test: 02/02/2026
Any material loss from containers during heating process/testing?: no data
Mass of container #1 before test (m1i): 201.364 grams
Mass of container #2 before test (m2i): 203.028 grams
Mass of container #1 after test (m1f): 201.177 grams
Mass of container #2 after test (m2f): 202.839 grams
Mass of empty container #1: 166.338 grams
Mass of empty container #2: 167.956 grams
Mass correction factor: 0.006
Average mass change: -0.530 percent
General comments (publicly viewable) (Max 1000 characters): Mass Change
Test was verified on 2/4/2026 ✔
