Summary for Test 2026-01-29-2-2

Test performed: ASTM C1611-21

Project Information

Project IdentifiersProject ID: 1001329
DEA: 100X7404
EFIS: 1013000008
DIST-CO-RTE-PM10-CAL-12-17.1/17.5
Award Date09/03/2025
Closeout DateNot set
Work DescriptionBRIDGE REPLACEMENT.
Location DescriptionCALAVERAS COUNTY NEAR SAN ANDREAS FROM 0.2 MILE WEST OF NORTH FORK CALAVERAS RIVER BRIDGE TO 0.2 MILE EAST OF NORTH CALAVERAS RIVER BRIDGE
QA Service Level1 (Verified on 06/16/2025)

Sample Information

Sample Taken Date01/29/2026 Sample Unique Key2
Date that the sample was received by the laboratory/organization performing the testing01/29/2026 Sample typeQuality Control
A brief description of the sample1 cubic foot The quantity of what the sample constitutes1 cubic foot
From where was the sample collectedFabricator First name of sampler or witnessed byPatrick
Last name of sampler or witnessed byBaddu Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameConFab Lathrop
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberK98CP1L
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected3369
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBed 5, 3rd Truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2026-01-29-2
DIME Test ID: 2026-01-29-2-2
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: ASTM C1611-21: Standard Test Method for Slump Flow of Self-Consolidating Concrete
Test Release Date: 2026-01-29

Test Results


What unit system is used for measurements?: inches
Input Type: Calculated
Tester's full name: Patrick Wright
Date of test: 01/29/2026
Filling the mold procedure: Filling Procedure B (Inverted Mold)
Diameter 1: 23.5 in
Diameter 2: 23.5 in
Visual Stability Index: 0
Slump Flow: 23.5 in
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/29/2026 ✔