Summary for Test 2026-01-20-3-3

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 1000938
DEA: 101U1004
EFIS: 1025000094
DIST-CO-RTE-PM10-UNKNOWN--
Award Date12/06/2024
Closeout Date05/05/2026
Work DescriptionNot set
Location DescriptionNot set
QA Service Level1 (Verified on 02/04/2025)

Sample Information

Sample Taken Date01/20/2026 Sample Unique Key3
Date that the sample was received by the laboratory/organization performing the testing01/20/2026 Sample typeInformational
A brief description of the sampleSkid Testing Request The quantity of what the sample constitutesMultiple Lanes
From where was the sample collectedJob Site First name of sampler or witnessed byJohnsky
Last name of sampler or witnessed byOveny Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameViking Construction Company
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier29-0095 Structure nameCalaveras River Bridge
Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedBehind K-Rail/Barrier DIST-CO-RTE10-SJ-99-21.9
Direction of TravelWest Post Mile
Lanes to be TestedShoulder,Lane #1,Lane #2 Station21.91

Test Details

DIME Sample ID: 2026-01-20-3
DIME Test ID: 2026-01-20-3-3
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2026-01-27

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Jessie Wilson
Date of test: 01/26/2026
Air Temperature: 44
Tire Pressure: 25
Equipment PST #: 1009
Is Calibration within ± values: Yes
Weather: Overcast
Direction/Lane #: WB: Westbound Direction of Travel
Edge used to measure reference distance: Beginning of Bridge
Edge used to measure position: Left of Right Bridge Wall
Reference Distance 1: 89
Reference Distance 2: 92
Reference Distance 3: 95
Direction and Lane # for Stationing 1: WB
Direction and Lane # for Stationing 2: WB
Direction and Lane # for Stationing 3: WB
Position for Stationing 1: 9
Position for Stationing 2: 9
Position for Stationing 3: 9
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.31
Corrected Coefficients of Friction for Stationing 2: 0.32
Corrected Coefficients of Friction for Stationing 3: 0.32
Average Coefficient of Friction: 0.32
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/27/2026 ✔