Summary for Test 2025-07-21-53-6
Test performed: CTM 389-19Project Information
| Project Identifiers | Project ID: 995538 DEA: 024H0604 EFIS: 0218000073 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU,PLU-36- |
| Award Date | 11/05/2024 |
| Closeout Date | Not set |
| Work Description | CHESTER CAUSEWAY REHAB |
| Location Description | LASSEN AND PLUMAS COUNTIES FROM MELISSA AVENUE TO 0.6 MILE EAST OF RED RIVER CANAL |
| QA Service Level | 1 (Verified on 10/24/2024) |
Sample Information
| Sample Taken Date | 07/21/2025 | Sample Unique Key | 53 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/22/2025 |
| Sample type | Production Start-Up | A brief description of the sample | 16 boxes of Lime Treated 3/4-inch Type A HMA (eq. PG 64-28) |
| The quantity of what the sample constitutes | Production Start-Up Evaluation | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Joe | Last name of sampler or witnessed by | Delgado |
| Title of sampler | Consultant | Telephone number of sampler | |
| Laboratory sample identification | D79965 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Dig It Construction — Sierra Cascade Aggregate and Asphalt Products (Chester, CA) | Transportation Laboratory (TL) Number | 867340 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | ||
| Binder content (%) | 5.9 | Virgin binder PG | |
| Design binder PG | PG 64-28 | Binder Supplier | Albina (Klamath Falls, OR) |
| RAP content (%) | 24 | WMA Additives | No |
| Antistrip type | Lime |
Test Details
DIME Sample ID: 2025-07-21-53
DIME Test ID: 2025-07-21-53-6
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 389-19: Method of Test for Hamburg Wheel-Track Testing of Compacted Hot Mix Asphalt
Test Release Date: 2026-01-22
Test Results
Specified number of passes at 12.7 mm: 15000
Specimen Preparation Method: PMLC
Input Type: Measured
Tester's full name: Josh Ferency
Date of test: 08/01/2025
Test Temperature: 122 F
Compaction Method: SGC Cylindrical Specimen
Air Void Content for specimen A-1: 7.0 %
Air Void Content for specimen A-2: 6.9 %
Air Void Content for specimen B-1: 6.8 %
Air Void Content for specimen B-2: 7.0 %
Stripping Inflection Point (Wheel A): >15000
Stripping Inflection Point (Wheel B): >15000
Maximum impression at 5000 passes (left wheel): 1.58 mm
Maximum impression at 5000 passes (right wheel): 1.84 mm
Average impression at 5000 passes (left/right avg): 1.71 mm
Maximum impression at 10000 passes (left wheel): 1.89 mm
Maximum impression at 10000 passes (right wheel): 2.24 mm
Average impression at 10000 passes (left/right avg): 2.07 mm
Maximum impression at 15000 passes (left wheel): 2.12 mm
Maximum impression at 15000 passes (right wheel): 2.53 mm
Average impression at 15000 passes (left/right avg): 2.33 mm
Maximum impression at 20000 passes (left wheel): no data
Maximum impression at 20000 passes (right wheel): no data
Average impression at 20000 passes (left/right avg): no data
Maximum impression at 25000 passes (left wheel): no data
Maximum impression at 25000 passes (right wheel): no data
Average impression at 25000 passes (left/right avg): no data
Raw Data: no data
General comments (publicly viewable) (Max 1000 characters): CT 360:
SA=0.5g/cm²;
CT 389:
Rut=0.1in.@N₁₅₀₀₀,
Nf>15000,
SIP>15000
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| D79965, 867340, 02-4H0603, HWT | 797.43 KB | 01/22/2026 | 2025-07-21-53-6 | Info |
Test was verified on 1/22/2026 ✔
