Summary for Test 2026-01-15-23-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 1001908 DEA: 081T5304 EFIS: 0826000083 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-138- |
| Award Date | 01/19/2026 |
| Closeout Date | 04/07/2026 |
| Work Description | Not set |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 01/15/2026 | Sample Unique Key | 23 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 01/15/2026 | Sample type | Acceptance |
| A brief description of the sample | Native Subgrade | The quantity of what the sample constitutes | 28,178 g |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Mohammed |
| Last name of sampler or witnessed by | Haque | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Jobsite material |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | SR 138, PM 12.6, Sta: 667+00 to 671+00 | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2026-01-15-23
DIME Test ID: 2026-01-15-23-1
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2026-01-16
Test Results
Method Type:: Standard Count
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Mohammed Haque
Date of test: 01/15/2026
Sum of Count or Density: 5292 g/cc
Average of Count or Density: 1058 g/cc
Sum of Moisture Count: 470 g/cc
Average of Moisture Count: 94 g/cc
Count Ratio Density: 0.68
Count Ratio Moisture: 0.15
Calculated Percent Relative Compaction: 97.3 %
Reported Percent Relative Compaction: 97 %
General comments (publicly viewable) (Max 1000 characters): Density Spec 95%
Test was verified on 1/16/2026 ✔
