Summary for Test 2026-01-14-18-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 1001908 DEA: 081T5304 EFIS: 0826000083 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-138- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Not set |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 01/14/2026 | Sample Unique Key | 18 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/14/2026 |
| Sample type | Acceptance | A brief description of the sample | Native Subgrade |
| The quantity of what the sample constitutes | 20,249g | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Tony | Last name of sampler or witnessed by | Price |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Jobsite material |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | SR 138, PM 12.6, Sta: 667+00 to 671+00 | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2026-01-14-18
DIME Test ID: 2026-01-14-18-1
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2026-01-16
Test Results
Method Type:: Standard Count
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Tony Price
Date of test: 01/14/2026
Sum of Count or Density: 9470 g/cc
Average of Count or Density: 1894 g/cc
Sum of Moisture Count: 384 g/cc
Average of Moisture Count: 77 g/cc
Count Ratio Density: 1.11
Count Ratio Moisture: 0.12
Calculated Percent Relative Compaction: 95 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters): Density Spec 95%