Summary for Test 2018-01-01-12-2
Test performed: AASHTO T315-12Project Information
| Project Identifiers | Project ID: 99999 DEA: 0322222 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC,OMG-888,99,80-0.6-0.6 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
| Location Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
| QA Service Level | (Verified on 04/05/2013) |
Sample Information
| Sample Taken Date | 01/01/2018 | Sample Unique Key | 12 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 01/01/2018 | Sample type | Quality Control |
| A brief description of the sample | PG 64-16 | The quantity of what the sample constitutes | JMF Verification |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | a |
| Last name of sampler or witnessed by | a | Title of sampler | Unknown |
| Telephone number of sampler | Unknown | Laboratory sample identification | 3512 17-02-S1b |
| Linked DIME Sample ID | Unknown | The fabricator/manufacturer/facility name | Pacific Northwest Oil - Stockton, CA |
| Transportation Laboratory (TL) Number | Unknown | Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown |
| Structure unique identifier | Not set | Structure name | Not set |
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
|---|---|---|---|
| Modified | Not set | Lot number | Not set |
| Sublot number | Not set | Tank number | Not set |
| Time of sample | Not set | HMA Supplier | Not set |
| Certified Asphalt Supplier | Not set | Multigrade | Not set |
| Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2018-01-01-12
DIME Test ID: 2018-01-01-12-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T315-12: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Test Release Date: 2018-01-16
Test Results
Input Type: Calculated
Tester's full name: Ward Jenkins
Date of test: 01/01/2018
Phase: no data
Phase Angle (δ) (for the 10 cycles): no data
Dynamic Shear, G*/sin(δ): 4.69 kPa
(G*) x sin(δ)=: 5000 kPa
General comments (publicly viewable) (Max 1000 characters): G*sin(delta) is fake.
Test was verified on 1/9/2018 ✔
