Summary for Test 2026-01-10-9-2
Test performed: AASHTO T308-25Project Information
| Project Identifiers | Project ID: 995228 DEA: 07347904 EFIS: 0718000123 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-405-31.2/41.4 |
| Award Date | 03/07/2025 |
| Closeout Date | Not set |
| Work Description | COLD PLANE, PLACE HMA, RHMA, JPCP, ISR, & REPLACE BRIDGE SLABS. |
| Location Description | LOS ANGELES FROM WILSHIRE BOULEVARD UNDERCROSSING TO VICTORY BOULEVARD UNDERCROSSING |
| QA Service Level | 1 (Verified on 01/22/2024) |
Sample Information
| Sample Taken Date | 01/10/2026 | Sample Unique Key | 9 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/12/2026 |
| Sample type | Acceptance | A brief description of the sample | 3/4" HMA-A |
| The quantity of what the sample constitutes | 750 Tons | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | VICTOR | Last name of sampler or witnessed by | Pham |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | 26-010 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Vulcan Materials Sun Valley | Transportation Laboratory (TL) Number | 0110B2 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | 220200W SVA VLO | |
| Binder content (%) | 0.0 | Virgin binder PG | |
| Design binder PG | Binder Supplier | ||
| RAP content (%) | Not set | WMA Additives | |
| Antistrip type |
Test Details
DIME Sample ID: 2026-01-10-9
DIME Test ID: 2026-01-10-9-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: AASHTO T308-25: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2026-01-13
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Daniel Gomez
Date of test: 01/13/2026
Test procedure used?: Method A
Mass of the specimen basket assembly: 4103.4 g
Mass of the specimen and specimen basket assembly prior to ignition: 6186.2 g
Mass of HMA Sample prior to ignition: 2082.8 g
Mass Loss: 105.3 g
Mass of aggregate remaining after ignition: 1977.5 g
Correction Factor (Percent by mass of HMA Specimen): 0.39 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 4.67 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/13/2026 ✔
