Summary for Test 2018-01-01-11-3

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 99999
DEA: 0322222
DIST-CO-RTE-PM03-SAC,OMG-888,99,80-0.6-0.6
Award DateNot set
Closeout DateNot set
Work DescriptionTHIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES.
Location DescriptionTHIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES.
QA Service Level (Verified on 04/05/2013)

Sample Information

Sample Taken Date01/01/2018 Sample Unique Key11
Date that the sample was received by the laboratory/organization performing the testing01/01/2018 Sample typeQuality Control
A brief description of the sample3/8-inch RAP The quantity of what the sample constitutesJMF Verification
From where was the sample collectedManufacturer First name of sampler or witnessed bya
Last name of sampler or witnessed bya Title of samplerUnknown
Telephone number of samplerUnknown Laboratory sample identification3512 17-02-S1b
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility nameSNC - Mustang Asphalt Plant
Transportation Laboratory (TL) NumberUnknown Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceMustang Asphalt Plant
Aggregate Size3/8-inch Aggregate SourceUnknown
RAP StockpileStatic Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2018-01-01-11
DIME Test ID: 2018-01-01-11-3
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2018-01-16

Test Results


What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Ward Jenkins
Date of test: 01/01/2018
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 6.20 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/9/2018 ✔