Summary for Test 2026-01-09-24-7
Test performed: CTM 202-November 2011Project Information
| Project Identifiers | Project ID: 1001375 DEA: 040A53T4 EFIS: 0421000155 COOP: 040A53TCM |
|---|---|
| DIST-CO-RTE-PM | 04-SOL-80-L1.8/L3.2 |
| Award Date | 06/20/2025 |
| Closeout Date | Not set |
| Work Description | Construct I-80 WB Truck Scales |
| Location Description | CONSTRUCTION ON STATE HIGHWAY IN SOLANO COUNTY IN AND NEAR FAIRFIELD ON ROUTE 12 FROM THE 80/12 EAST JUNCTION TO 0.9 MILE EAST OF CHADBOURNE ROAD UNDERCROSSING AND ON ROUTE 80 FROM 0.5 MILE WEST OF DAN WILSON CREEK BRIDGE TO WEST TEXAS STREET UNDERCROSSI |
| QA Service Level | 1 (Verified on 07/10/2025) |
Sample Information
| Sample Taken Date | 01/09/2026 | Sample Unique Key | 24 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/09/2026 |
| Sample type | Quality Assurance | A brief description of the sample | 1" x #4 pcc agg |
| The quantity of what the sample constitutes | 270 CY | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Christian | Last name of sampler or witnessed by | Sousa |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Central Lake Herman | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Orca / Vulcan Pleasanton |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Stockpile @ Plant | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2026-01-09-24
DIME Test ID: 2026-01-09-24-7
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2026-01-12
Test Results
What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Henry Concepcion
Date of test: 01/09/2026
| Sieve Size | Cumulative Percent Passing | |||||
|---|---|---|---|---|---|---|
| 100 % | ||||||
| 98 % | ||||||
| 80 % | ||||||
| 61 % | ||||||
| 43 % | ||||||
| 19 % | ||||||
| 5 % | ||||||
| 1 % | ||||||
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/12/2026 ✔