Summary for Test 2026-01-10-3-1
Test performed: CTM 216-June 2011Project Information
| Project Identifiers | Project ID: 995228 DEA: 07347904 EFIS: 0718000123 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-405-31.2/41.4 |
| Award Date | 03/07/2025 |
| Closeout Date | Not set |
| Work Description | COLD PLANE, PLACE HMA, RHMA, JPCP, ISR, & REPLACE BRIDGE SLABS. |
| Location Description | LOS ANGELES FROM WILSHIRE BOULEVARD UNDERCROSSING TO VICTORY BOULEVARD UNDERCROSSING |
| QA Service Level | 1 (Verified on 01/22/2024) |
Sample Information
| Sample Taken Date | 01/10/2026 | Sample Unique Key | 3 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/10/2026 |
| Sample type | Acceptance | A brief description of the sample | aggregate base |
| The quantity of what the sample constitutes | 104 cy | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | jacinto | Last name of sampler or witnessed by | villanueva |
| Title of sampler | TEC | Telephone number of sampler | 8182096574 |
| Laboratory sample identification | 26-0095 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Vanguard | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | vanguard |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | From Variouys Location at Aggregate Base | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2026-01-10-3
DIME Test ID: 2026-01-10-3-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2026-01-11
Test Results
Is oversize material: No
Input Type: Measured
Tester's full name: Jacinto Villanueva
Date of test: 01/10/2026
In-place wet density: 2.11
Highest adjust wet density: 2.11
% Moisture: 9.7 %
Optimum Moisture: 9.7 %
Relative compaction: 100
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/11/2026 ✔
