Summary for Test 2025-07-18-107-3

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 993446
DEA: 120J34U4
EFIS: 1218000034
DIST-CO-RTE-PM12-ORA-55,55-29.6,R6.4/10.3
Award Date05/27/2022
Closeout DateNot set
Work DescriptionCONSTR BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS.
Location DescriptionORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 MILE SOUTH OF ROUTE 5/55 SEPARATION
QA Service Level1 (Verified on 06/24/2022)

Sample Information

Sample Taken Date07/18/2025 Sample Unique Key107
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/19/2025
Sample typeQuality Control A brief description of the sample6X12 Concrete Cylinders
The quantity of what the sample constitutes4 From where was the sample collectedJob Site
First name of sampler or witnessed byJames Last name of sampler or witnessed byRogers
Title of sampler Telephone number of sampler
Laboratory sample identificationMix A80C440T13 Set 1 Linked DIME Sample ID
The fabricator/manufacturer/facility nameNational Ready Mix, Irvine Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberA80C440T13
The truck number from where the sample was collectedLoad 1 The batch plant ticket number from where the sample was collectedUnknown
Concrete batch plant The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedRW 416 Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2025-07-18-107
DIME Test ID: 2025-07-18-107-3
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2026-01-07

Test Results


Input Type: Calculated
Tester's full name: James Rogers
Date of test: 07/18/2025
Air Content: 2.2 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/7/2026